loading
Project Details

  • Contractor:
    UEM Construction (UEMC) and Bina Puri Holdings
  • Location:
    Kuala Lumpur, Malaysia

Judah-RONDO – has supplied our KEY-LOCK Suspended Concealed Ceiling System to the new KLIA2 terminal. The KLIA2 is built to be Malaysia’s Next Generation Hub – an airport hub that will allow seamless connectivity between low-cost and full-service carriers.

The new KLIA2 terminal is measured to be at least 257,000 square meter, with 60 gates, 8 remote stands, 80 aerobridges, plus a retail space of 32,000 square meters to accommodate 225 retail outlets. It’s designed to accommodate 30 million passengers with the provision to expand to 45 million passengers a year.

Judah Steel products used on this project

KEY-LOCK® Trafficable Ceiling System

Our most popular and superior ceiling system. Available in suspended applications, it produces a high-quality structure that has the ability to hold multiple layers of board, can be used in both fire-rated and non-fire-rated environments, as well as being suitable for acoustic, bulkhead and seismic designs.

error: Content is protected !!