loading
Project Details

  • Contractor:
    Superior Group, NWCI Pty Ltd, Mewcastle Pty,Ltd. TAF Group
  • Location:
    Gold Coast, Queensland
  • Project Value:
    $1.76 billion

Judah Steel products used on this project

KEY-LOCK® Suspended Ceiling System

Our most popular and superior ceiling system. Available in suspended applications, it produces a high-quality structure that has the ability to hold multiple layers of board, can be used in both fire-rated and non-fire-rated environments, as well as being suitable for acoustic, bulkhead and seismic designs.

MAXIframe® External Wall Framing System

This external wall framing system offers a cost-effective solution for light-weight steel framing when compared to traditional external wall construction methods.

DUO® Exposed Grid Ceiling System

Expertly engineered for fast assembly on site, Cross Tees positively lock into each other through the Main Tee to create a sturdy exposed grid ceiling system. Seismic Designs that have been fully tested to meet code requirements are available. 

PANTHER® Access Panel

Whether you need a standard Access Panel, or a specialised architectural panel, PANTHER® Access Panels are the perfect choice.

error: Content is protected !!