loading
Project Details

  • Builder:
    Brookfield Multiplex
  • Contractor:
    Sydney Projects
  • Architect:
    JPW Architects
  • Location:
    Sydney, NSW
  • Project Value:
    $83 Million

Judah Steel products used on this project

KEY-LOCK® Suspended Ceiling System

Our most popular and superior ceiling system. Available in suspended applications, it produces a high-quality structure that has the ability to hold multiple layers of board, can be used in both fire-rated and non-fire-rated environments, as well as being suitable for acoustic, bulkhead and seismic designs.

Steel Stud & Track Wall Framing System

Light-weight steel stud and track drywall framing for internal plasterboard wall systems and specific external wall applications.

error: Content is protected !!